Throughout the city, there are many development projects taking place. Current development projects are organized by city wards.
The feed below and search panel are specific to all current development application pages. Use the search panel to search development applications by address, and/or select "refine by category" to filter feed results to specific wards. Development application ward feeds can also be subscribed to by visiting subscribe.burlington.ca
Posted on Wednesday, December 04, 2024 02:33 PM
City Council adopted a plan for this development in 2018. On July 19, 2024, the Ontario Land Tribunal (OLT) approved zoning regulations and a draft plan of subdivision for the Evergreen Community. OLT file number OLT-22-003001
Next steps: Evergreen Community Ltd. is working on a detailed design to meet the conditions of approval required by the City, Halton Region, Conservation Halton and local utilities....
Posted on Thursday, November 28, 2024 11:30 AM
Learn more about the Planning Process...
520-08/24 & 505-03/24
Posted on Friday, November 08, 2024 12:36 PM
84, 92 & 104 Plains Rd E & 990 Glenwood Dr.
No comments are received by the City during the Pre-Application phase. Public comments may be directed to the applicant during this time. Once a complete application has been received the public will be notified, and comments will be received by City staff.
The proposed development consists of an 11-storey mixed-use building containing commercial and residential uses at-grade, and residential uses in its above-ground levels. The proposed concept provides vehicular parking in a surface parking area located along the south side of the building and below-grade in 3 underground levels. In total, approximately 316 vehicle parking spaces and 276 bicycle parking spaces are provided. The proposed concept provides a total of 255 residential units, consisting of 3...
Posted on Monday, October 21, 2024 03:11 PM
Update, Oct. 21, 2024: The Ontario Land Tribunal (OLT) has dismissed the appeal and refused the amendments to the Official Plan and Zoning By-law. For more information, refer to the “Ontario Land Tribunal (OLT) Appeal” section below.
Please note: this development application process is separate from the Waterfront Hotel Study. For more information on the Waterfront Hotel Study, visit: burlington.ca/waterfronthotelstudy.
Posted on Monday, September 16, 2024 12:41 PM
These applications will permit an asphalt plant with outdoor storage, a 232 m2 operation building, unenclosed silos and a heated rotary drum. Vehicular access is proposed along the east side of the property that extends northerly to the existing landfill site. The proposed development will have 6 surface parking spaces.
Official Plan Amendment: 505-04/24
Zoning By-law Amendment: 520-09/24
Contact Us