Metrolinx will be doing construction at the train track crossing at Burloak Drive. For everyone’s safety, Burloak Drive will be closed to all traffic including pedestrians and cyclists from Harvester Road to north of Prince William Drive. This work is part of their project for the Burloak Drive grade separation project.
The road closure will begin at 7 p.m. on Friday, June 14 through to 6:30 a.m. on Monday, June 24, 2024.
The road will be completely closed, except from 3 p.m. to 7 p.m., Monday to Friday (June 17-21), when it will be open for southbound traffic only.
The intersection of Burloak Drive and Prince William Drive will remain open to traffic during the closure.
For more information about this project, visit the Metrolinx project page.