Beginning Monday, April 29 to Friday, May 3, 2019, Prospect Street, between Dynes Road and the Hydro One Corridor will be closed nightly, from 10 p.m. to 6 a.m. for work by Halton Region on the Second Feedermain to Washburn Reservoir construction project.
During the nightly closure, Halton Region will be relocating Bell Canada infrastructure to allow for the installation of a future water valve chamber. The chamber will be used to connect the newly built 900mm watermain on Prospect Street with the existing 1050mm watermain at the Hydro One Corridor.
Detours:
Driveway access will be maintained at all times.
Learn more about the Second Feedermain to Washburn Reservoir project online or call Halton Region at 311,