Check this webpage for updates throughout the project. If you'd like to subscribe to be emailed a notification when the page is updated, please see the top right corner of this page.
Topic |
Name |
Contact |
|
Day-to-Day Construction inquiries |
Road, curb, storm sewer |
Ryan Stoneman |
905-335-7600, ext. 7818 |
Watermain and service replacement |
Wen Zhu |
905-826-6000, ext. 3466 |
The City of Burlington and Halton Region will be working on:
Holt Drive, west of Vanderburgh Drive Gayne Boulevard, south portion at Holt Drive |
Asphalt replacement, curb replacement/addition, storm sewer replacement
|
|
Holt Drive, east of Vanderburgh Drive Cherrywood Drive |
Asphalt replacement, localized curb and sidewalk replacement, storm repairs |
Watermain and service replacement |
Gayne Boulevard, north section |
Asphalt replacement |
|
Public Information Centre |
Burlington Art Gallery March 22, 2018, 6 p.m. to 7:30 p.m. |
Construction |
June to November 2018 - to be confirmed |
All roads under construction will be closed to through traffic. You will still have access to your home. For more information, please see the Information for Homeowners section below.
Information for Homeowners |
ParkingDuring construction, the five-hour maximum limit for street parking will not apply when your driveway is inaccessible or closed. In this situation, please park on neighbouring streets, where there is no construction. Please do not:
Please obey all parking regulations to make sure you don't receive a ticket. If you have any questions about parking, please contact Parking Services at 905-335-7816. Garbage PickupPlease continue to put your garbage and recycling out on the usual day. It is the contractor's responsibility to move your garbage to a location that can be easily picked up by the garbage truck and return your garbage containers. To help the contractor return your bins to you, we ask that you write your house number on your garbage cans, recycling bins and green carts. Access to Your HomeDuring normal construction hours, Monday to Friday, 7 a.m. to 5:30 p.m., vehicle access to and from your property may be difficult, and driveways may be temporarily closed when work is being carried out in the immediate area. The inspector or contractor will notify you of this before the closure. Water ServicesAs with any project of this nature, there may be some disruptions to water services at times throughout the construction. You will be given a minimum of 48 hours notice before any scheduled water shut down. Thank you for your patience. VibrationThere may be times when you feel some minor vibrations from construction equipment. We recommend that you remove small, light objects from shelving around the house to prevent damage. Lawn Irrigation SystemIf you have a lawn irrigation system, we recommend that you disconnect and remove any sprinkler heads within the city's road allowance. The city inspector will notify you if your system is affected. |
Project Updates |
For more information about this project, contact:
Ryan Stoneman
Contract Administrator
905-335-7600, ext. 7818
ryan.stoneman@burlington.ca