Check this webpage for updates throughout the project. If you'd like to subscribe to email notification when the page is updated, please see the top right corner of this page.
The City of Burlington will be doing road repair work on Kenwood Avenue, from Lakeshore to Bromley East, 12 Mile Trail from the north leg to the bulb, and Harrison Court from Appleby Line to 130m Easterly the summer of 2021.
Inquiry |
Contact |
Day-to-day construction inquiries |
Bart Barns, Construction Inspector City of Burlington |
All other construction inquires |
Katie Haines, C.E.T. Contract Administrator of Design and Construction Tel. 905-335-7600, ext.7567
|
The City of Burlington will be working on:
Location |
City Works |
Kenwood Avenue between Lakeshore Road to Bromley Road East |
|
12 Mile Trail between the north leg to the bulb |
|
Harrison Court between Appleby Line to 130m Easterly |
|
Construction |
|
Kenwood Avenue |
July 2021 to September 2021 |
12 Mile Trail |
July 2021 |
Harrison Court |
July 2021 |
Note: The construction schedule outlined is tentative. Additional information will be provided once the contract has been awarded and schedule confirmed.
Road Closures
Lane restrictions and short-term road closures will be in place during construction. Local residents will still have access to homes. For more information, please see the Information for Homeowners section below.
Information for Homeowners |
Parking During construction, the five-hour maximum limit for street parking will not apply when your driveway is inaccessible or closed. In this situation, please park on neighboring streets, where there is no construction. Please do not:
Please obey all parking regulations to make sure you don't receive a ticket. If you have any questions about parking, please contact Parking Services at 905-335-7816. Garbage Pickup Please continue to put your garbage and recycling out on the usual day. It is the contractor's responsibility to move your garbage to a location that can be easily picked up by the garbage truck and return your garbage containers. To help the contractor return your bins to you, we ask that you write your house number on your garbage cans, recycling bins and green carts. Access to Your Home During normal construction hours, Monday to Friday, 7 a.m. to 5:30 p.m., vehicle access to and from your property may be difficult, and driveways may be temporarily closed when work is being carried out in the immediate area. The inspector or contractor will notify you of this before the closure. Vibration There may be times when you feel some minor vibrations from construction equipment. We recommend that you remove small, light objects from shelving around the house to prevent damage. Lawn Irrigation System If you have a lawn irrigation system, we recommend that you disconnect and remove any sprinkler heads within the city's road allowance. The city inspector will notify you if your system is affected. Road Closures/Lane Restrictions Once a Contractor has been hired and a tentative construction schedule finalized, additional information will be provided to the public. |
Updates will be posted throughout the project.
For more information about this project, contact:
Rob Stuart
Project Manager
Tel. 905-335-7600, ext.7519
robert.stuart@burlington.ca