Project Scope
This project will include the following works:
Lomond Crescent
Ayr Place
Public Information Centre |
Robert Bateman High School 5151 New Street, Burlington, ON Wednesday Dec 4, 2019 from 6 to 8 p.m. |
Construction |
June to November 2020 Top layer of asphalt will be placed in spring 2021 |
Information for Homeowners |
ParkingDuring construction, the five-hour maximum limit for street parking will not apply when your driveway is inaccessible or closed. In this situation, please park on neighbouring streets, were there is no construction. Please do not:
Please do obey all parking regulations to make sure you don’t get a ticket. If you have any questions about parking, please contact Parking Services at 905-335-7816. Garbage PickupPlease continue to put your garbage and recycling out on the usual day. It is the contractors' responsibility to move your garbage to a location that can be easily picked up by the garbage truck and return your garbage containers. To help the contractor return your bins to you, we ask that you write your house number on your garbage cans, recycling bins and green carts. Access to Your HomeDuring normal construction hours, Monday to Friday, 7 a.m. to 5:30 p.m., vehicle access to and from your property may be difficult, and driveways may be temporarily closed when work is being carried out in the immediate area. The inspector or contractor will notify you of this before the closure. VibrationThere may be times when you feel some minor vibrations from construction equipment. We recommend that you remove small, light objects from shelving around the house to prevent damage. Lawn Irrigation SystemIf you have a lawn irrigation system, we recommend that you disconnect and remove any sprinkler heads within the city's road allowance. The city inspector will notify you if your system is affected. |
Project Updates |