The public information session that was scheduled for Wednesday, Feb. 6, 2019 at St. Raphael School on New Street was cancelled.
It has been rescheduled for Wednesday Feb. 20, 2019 at St. Raphael School.
Check this web page for updates throughout the project. If you'd like to subscribe to be emailed a notification when the page is updated, please see the top right corner of this page.
Topic |
Name |
Contact |
|
Day-to-Day Construction inquiries |
Road, curb, storm sewer, and general inquiries |
Ryan Stoneman - Contract Administrator |
905-335-7600, ext. 7818 |
Watermain and wastewater main replacement |
David Olsen -Senior Project Advisor |
905-825-6000, ext. 7433 |
The City of Burlington and Halton Region will be working on:
Rexway Drive |
Full asphalt and curb replacement Localized sidewalk replacement and storm sewer repairs |
Full watermain and water service replacement Wastewater main and lateral replacement – Cumberland Ave.to Woodview Dr. |
Ramsgate Rd., Montego Cr., Glen-moor Cr. |
Full asphalt, curb, and road base replacement Localized sidewalk replacement and storm sewer repairs |
Full watermain and water service replacement |
Maclaren Dr. |
Full asphalt, curb, and road base replacement Localized sidewalk replacement and storm sewer repairs |
Full watermain and water service replacement Wastewater main and lateral replacement |
Caplan Cr., Northgate Dr. |
Full asphalt and curb replacement Localized sidewalk replacement and storm sewer repairs |
|
Public Information Centre |
St. Raphael Catholic Elementary School Wednesday February 6, 2019, 6:30 to 8:00 pm |
Construction |
Spring 2019 to Fall 2019 Spring/Summer 2020 To be confirmed as we know final details |
Lane restrictions will be in place during construction. You will still have access to your home. For more information, please see the Information for Homeowners section below.
Route 4 will detour via New Street between Walkers Line and Cumberland Ave. To take the Route 4, please proceed to a bus stop on Cumberland Avenue or New Street. During construction, please visit www.burlingtontransit.ca for the most up to date detour information.
Parking |
During construction, the five-hour maximum limit for street parking will not apply when your driveway is inaccessible or closed. In this situation, please park on neighbouring streets, where there is no construction. Please do not:
Please obey all parking regulations to make sure you don't receive a ticket. If you have any questions about parking, please contact Parking Services at 905-335-7816. |
Garbage Pickup |
Please continue to put your garbage and recycling out on the usual day. It is the contractor's responsibility to move your garbage to a location that can be easily picked up by the garbage truck and return your garbage containers. To help the contractor return your bins to you, we ask that you write your house number on your garbage cans, recycling bins and green carts. |
Access to Your Home |
During normal construction hours, Monday to Friday, 7 a.m. to 5:30 p.m., vehicle access to and from your property may be difficult, and driveways may be temporarily closed when work is being carried out in the immediate area. The inspector or contractor will notify you of this before the closure. |
Water Services |
As with any project of this nature, there may be some disruptions to water services at times throughout the construction. You will be given a minimum of 48 hours notice before any scheduled water shut down. Thank you for your patience. |
Vibration |
There may be times when you feel some minor vibrations from construction equipment. We recommend that you remove small, light objects from shelving around the house to prevent damage. |
Tree Removals |
Due to extensive and irreparable damage caused by the Emerald Ash Borer infestation, there are many trees in the Rexway Dr. area that require removal by the City of Burlington in 2019 and 2020. The City is replacing Ash trees along streets on a 1:1 basis where appropriate site conditions allow. Please follow the link for additional information regarding the Emerald Ash Borer Action Plan. |
Lawn Irrigation System |
If you have a lawn irrigation system, we recommend that you disconnect and remove any sprinkler heads within the city's road allowance. The city inspector will notify you if your system is affected. |
Road Closures/Lane Restrictions |
Once a Contractor has been hired and a tentative construction schedule finalized, additional information will be provided to the public. |
Updates will be posted throughout the project.
Project Updates |
For more information about this project, contact:
Ryan Stoneman
Contract Administrator
905-335-7600, ext. 7818
ryan.stoneman@burlington.ca