City of Burlington – Clean Water and Wastewater Fund (CWWF) Projects
In 2017, the City of Burlington began work on eight projects that received provincial and federal funding as part of the CWWF program. Each of these projects will benefit either the water, wastewater or stormwater systems in the City. A list of these projects is provided below.
BURL-001 |
Stormwater Quality Control Improvement-Installation Oil/Grit Separators – Multiple Locations |
BURL-002 |
Stormwater Management Pond Refurbishment – Infrastructure Repairs and Pond Dredging –Multiple locations |
BURL-003 |
Appleby Creek Environmental Assessment and Detailed Design for Stormwater Management –Fairview Street to Pinedale Avenue |
BURL-004 |
Roseland Creek Stormwater Erosion Protection – Guelph Line to Upper Middle Road |
BURL-005 |
Plains Road Storm Sewer Replacement (at Plains Road EAST/CNR Grade Separation) |
BURL-006 |
Inspection, Design and Rehabilitation of Rail Crossing Culverts – Multiple Locations along CN Halton and CN Oakville Subdivision Lines |
BURL-007 |
Replacements of Plains Road West Culverts (Patricia Avenue to Outlet) |
BURL-008 |
Replacement of Woodward Avenue Storm Sewers (Woodward Avenue to Castleguard Crescent) |
More information on the CWWF program is available at: http://www.infrastructure.gc.ca.