The City of Burlington hired IBI Group to conduct a Class Environmental Assessment (Class EA) Study Schedule 'B' for the section of Tuck Creek located south of Fairview Street to the hydro corridor (see Study Area Plan). This is to find opportunities for flood mitigation, while protecting the natural heritage features and functions. It will also look at upgrades to the culverts located at Rockwood Drive and Rexway Drive.
We are doing this work to follow up after the flood on Aug. 4, 2014, during which crossings at Rockwood Drive, and Rexway Drive were flooded.
The flood assessment study is being conducted as a 'Schedule B' project in compliance with the Municipal Engineers Association document Municipal Class Environmental Assessment and is addressing Phases 1 and 2 of the Class EA Process.
The Class Environmental Assessment will make recommendations, leading to municipally-led work to reduce flooding risks. A set of alternative solutions will be evaluated and presented to the public and agencies for comment at various points throughout the study. The study will also identify mitigative measures to reduce impacts of the work.
A key part of the study was consultation with you; the public, landowners and regulatory agencies. The Public Information Centre (PIC) held on Wednesday, Oct. 11, 2017 presented some solutions and study progress. Thank you to everyone who attended .
A second public information centre was held on Tuesday, Sept. 24, 2019. This PIC shared some solutions and progress so far.
Map of Study Area (PDF)
Notice of Study Commencement (PDF)
Oct 11, 2017 Notice of Public Information Centre (PDF)
Oct 11, 2017 PIC Information Boards (PDF)
Sept. 24, 2019 Notice of Public Information Centre (PDF)
Sept 24, 2019 PIC Information Boards (PDF)
Jan. 23, 2020 Notice of Study Completion (PDF)
Read the Class EA Study (PDF)
If you would like more information, to be added to the mailing list, or if you have specific comments related to this study, please contact either of the following:
Arif Shahzad, M. Eng., P. Eng. Senior Project Manager
City of Burlington
426 Brant St., P.O. Box 5013
Burlington, ON L7R 3Z6
905-335-7600, ext. 7486
arif.shahzad@burlington.ca
John Perks, MBA, P. Eng. Consultant Project Manager
IBI Group
101-410 Albert St.
Waterloo, ON N2L 3V3
519-585-2255, ext. 1201
john.perks@ibigroup.com