Check this webpage for updates throughout the project. If you’d like to subscribe to be emailed a notification when the page is updated, please see the top right corner of this page.
Public Information Centre
An Online Public Information Centre (PIC) will be held February 18, 2021 to provide input on these projects. The PIC will provide information regarding project scope, scheduling and traffic impacts.
How to Participate:
Step 1: View the information provided on this website. Information will be available for the duration of these projects and will be updated as new information becomes available.
Step 2: Attend the webinar presentation as per details below.
When: Feb. 18, 2021, 6:30 p.m. Eastern Time (1-hour presentation, 30-minute Q&A)
How: Please click the link below to join the webinar:
https://zoom.us/j/92190512234?pwd=dWJ5SDQ1c0NCclk5bXErcXR3ZFNBUT09
Passcode: 0pNekz
Or Telephone: Dial: +1 778 907 2071
Webinar ID: 921 9051 2234
Passcode: 562496
The City is committed to informing and engaging the public on these projects.
Project Scope
Walkers Line - Reconstruction Project No.: ES-21-04 |
Walkers Line - Bridge Replacement Project No.: ES-21-19 |
Project Scope: Roadway reconstruction. The work will include alignment changes, asphalt renewal, guide rail replacement (east side) and streetlight improvements.
|
Project Scope: Bridge replacement. The new bridge will meet the high water demands from heavy rainfall events and will be constructed with an upgraded traffic barrier and railings. The bridge width will be 1.5m wider on both sides. |
Construction Plans [PDF] |
Construction Plans [PDF] |
Schedule, Road closures and Traffic Impacts
Project: |
Walkers Line - Reconstruction |
Walkers Line - Bridge Replacement |
Schedule: |
June 21 to Sept. 2, 2021 |
June 7 to Oct. 8, 2021 |
Traffic Impact: |
Road closure North of Britannia Road (east) to South of Britannia Road (west) July 12 to Aug. 20, 2021 |
No road closure Bridge work will be staged, west side then east side. Roadway will be reduced to one lane and controlled with a temporary traffic signal. |
Documents, Reports and Updates
Project Updates |
For more information, please contact:
Bob Jurk, C.E.T., PMP
Senior Project Manager, Design and Construction
Capital Works Department
905-335-7600, ext. 7682
bob.jurk@burlington.ca