The City of Burlington undertook a Class Environmental Assessment (Class EA) on Tuck Creek to assess flooding and identify crossing and channel upgrades between New Street and Spruce Avenue.

Study Objectives

The study was undertaken as a result of the extreme weather event of Aug. 4, 2014, during which crossings at New Street, Regal Road, and Spruce Avenue were overtopped by flood waters. The city previously undertook a Class EA for erosion control on Tuck Creek within the same study area.

The flood study was conducted as a 'Schedule B' project in compliance with the Municipal Engineers Association document Municipal Class Environmental Assessment and is addressing Phases 1 and 2 of the Class EA Process.

The Class Environmental Assessment established recommendations, leading to Municipally-led capital works to address flooding and erosion risks. A set of alternative solutions were evaluated and presented to the public and agencies for comment at various points throughout the study. The study also identified mitigative measures to reduce impacts of the work.

Study Outcomes

Five alternatives were developed and evaluated to reduce flooding within this area. Based on the results of evaluation and consultation with the City, Conservation Halton and the public, Alternative 4 was selected as the preferred alternative.

Alternative 4 is upgrades to New Street, Regal Road and Spruce Avenue crossings and creek width increases.

This alternative will reduce the number of buildings at risk of flooding during a '100-year storm' and regional storm.

Project scope and schedule

As recommended by the EA study, the work will be completed in three phases:

  • Phase 1: Regal Road Bridge upgrade and channel improvements. Completed in 2019.
  • Phase 2: New Street Bridge upgrade and channel improvements. Channel works completed in 2020. New Street Bridge will be constructed 2025/2026.
  • Phase 3: Spruce Avenue Bridge upgrade and channel improvements. Construction scheduled for 2027/2028.

Public engagement

A key part of the study was consultation with you: the public, landowners and regulatory agencies. The Public Information Centre was held on Nov. 30, 2015 to present the potential solutions to address flooding risks and to gather feedback from the community. Thank you to everyone who attended.

Contact

Please contact one of our team members if you have questions or comments, or would like to be added to the project mailing list:

 

Arif Shahzad, M.Eng, P.Eng.

Senior Project Manager

City of Burlington

426 Brant St., P.O. Box 5013, Burlington, ON L7R 3Z6

Engineering Services - Development and Stormwater Management

905-335-7600, ext. 7486

Email Arif Shahzad

Documents, reports and updates

Updates will be posted throughout the project.

The documents below are posted as inaccessible PDF documents. If you would like a document in an alternative format or with communication supports, please submit an Accessible Document and Communication Request Form.

Subscribe Back to Environmental Assessments Projects

Contact Us


Design and Construction - Requirements
426 Brant St., PO Box 5013
Burlington, ON  L7R 3Z6

Phone: 905-335-7777
Email Design and Construction - Requirements