Port Nelson Park Renewal

calendar icon

Construction Schedule

Phase 2 construction - 2025

Port Nelson Parkette (3000 Lakeshore Rd.) will see more changes very soon. The shoreline protection work at Port Nelson Park is complete which means the project can move forward to Phase 2 design of the park space.

Check this webpage for ongoing project updates. If you wish to receive email notifications whenever the project page is updated, use the button located at the bottom right corner of this page, beneath the Contact Us details. To stay informed about all current city construction projects and other municipal news, please subscribe using the button positioned at the top right corner of this page.

Project schedule

Project milestones Timing

Routine playground condition inspection

Spring 2020

Playground demolition

Early August 2020

Design of shoreline protection

Late 2020 – 2021

Burlington City Council approval of 2021 capital budget

January 2021

Construction of shoreline area only

2022-2023

Playground design and community engagement

2023 to January 2024

Construction of playground area

Spring-Fall, 2025



Project contacts

Mamie Sealey-Baker
Recreation Planner
Recreation, Community and Culture
T. 335-7600 ext. 7627
Email Mamie Sealey-Baker

Kim Napier 
Project Manager,
Engineering Services - Parks Design and Construction 
City of Burlington 
Tel. 905-335-7600, ext. 7900 
Email Kim Napier

Documents, reports and updates

Updates will be posted throughout the project.

Selected park concept and playground concept from the Get Involved Burlington survey.

These features will be included in the design:

  • Trees will not be cut down for the final design. Trees will be planted in phase 2.
  • Existing memorial bench to remain and memorial benches removed for shoreline construction access will be re-installed new
  • Interpretative signage about the history of the area
  • Pathways throughout to access the park and view
  • Parking lot will be resurfaced

Please note a splash pad is not an option for this space and there is no access to the lake.

Please take a few minutes to complete the survey* that will influence the park design, with construction happening in 2024. The survey is open now until May 19, 2023.

*Survey is now closed.

Due to an extensive shoreline design and permitting process, the window for shoreline construction will not be met in 2021 and will be extended to Summer 2022. The new timeline is reflected below. 

In spring 2020, the City of Burlington playground maintenance staff completed a safety inspection of the playground equipment in Port Nelson Parkette. The condition of the equipment was found to be poor with potential to become unsafe if not repaired or removed. The replacement parts are no longer available and the structure may be compromised. To protect the health and well-being of kids using the park, the playground equipment was removed August 2020.

The playground equipment was identified in the proposed capital budget for replacement in 2022. Since the park requires shoreline protection work to be completed ahead of the park renewal, the city decided to keep the playground construction on the intended timeline for 2022. This would allow for the proper public engagement and park design process to go ahead as planned.

Current Port Nelson shoreline from lakeside

Current Port Nelson shoreline from lakeside

Existing Playground

Existing Playground with path Existing Playground equipment

Subscribe Back to Park Renewal Projects

Contact Us


City of Burlington
426 Brant St., PO Box 5013,
Burlington, ON  L7R 3Z6

Phone: 905-335-7777
Toll Free: 1-877-213-3609
Email: city@burlington.ca