No. 1 Sideroad Closure, Nov. 18-Dec. 11
The City of Burlington will be replacing a culvert on No. 1 Sideroad near 3528 Walkers Line. As a result, that area of No. 1 Sideroad will be closed Nov. 18 to Dec. 11, 2026. The existing pipe will be removed and replaced to improve drainage capacity and long-term performance. Erosion and sediment control measures will be implemented to protect the surrounding environment throughout the construction period.
The surrounding slope will be restored, compacted, and replanted to improve stability and long-term resilience. Any areas affected by construction, including the roadway, will be fully restored to appropriate standards.
Map of Area
Detour Map
Detour routes will be in place to ensure safe and continued access during the work. There will be no through access between Guelph Line and Walkers Line, however, this portion of No. 1 Sideroad will be accessible via Guelph Line for local traffic.
For your safety, please avoid the construction area during the project. We appreciate your patience and cooperation as we complete this important repair.