Industrial Street and Plains Road Area Drainage Assessment Study

The City of Burlington has hired an engineering consultant to complete a drainage assessment of the Industrial Street and Plains Road East Area between Guelph Line and Brant Street. The study area is shown in the location map. This study aims to assess the existing drainage patterns, identify the causes of flooding and recommend measures to improve drainage.

Check this webpage for ongoing project updates. If you wish to receive email notifications whenever the project page is updated, use the button located at the bottom right corner of this page, beneath the Contact Us details. To stay informed about all current city construction projects and other municipal news, please subscribe using the button positioned at the top right corner of this page.

calendar icon

Project schedule

Fall 2024 - September 2026

Project scope

Staff will be taking photos and surveying the area. There will not be any disruption to the public or heavy machinery present within the area.

Project Update

The field work, drainage analysis and flood mitigation investigations have been completed. The consultant has prepared a draft report which is being reviewed by City staff. The assessment report and study findings will be finalized by September 2026.

Project schedule

  • Anticipated Starting Date: Fall 2024
  • Anticipated Completion Date: September 2026

Contacts

Umar Malik, M.Eng., P.Eng.

Senior Stormwater Engineer - Development

Engineering Services

City of Burlington

905-335-7777, ext. 7426

Email Umar Malik


Matt Senior, M.A.Sc., P.Eng.

Senior Water Resources Engineer

WSP

1-289-245-0586

1-905-802-4706

Email Matt Senior

Subscribe Back to Stormwater Management Projects

Contact Us


Design and Construction - Roadways
426 Brant St., PO Box 5013
Burlington, ON  L7R 3Z6

Phone: 905-335-7777
Email Design and Construction - Roadways