Rambo Creek Erosion Control Project between Victoria Avenue and Emerald Crescent

The 2020 City Wide Creek Erosion Assessment Study identified ongoing erosion along Rambo Creek between Victoria Avenue and Emerald Crescent, posing a risk to public infrastructure, utilities, and nearby private properties.

Project scope

On the west side of the creek, erosion has caused the channel to widen, bringing the top of the bank to within less than 1 meter of private infrastructure, including a parking area with a wooden fence and concrete barrier wall. Several small stormwater outfalls in the area are in poor condition, and runoff from the adjacent parking lot is also contributing to further erosion.

As part of this project, the City will complete restoration in this section of Rambo Creek, as shown in the location map. The project will include creek bank stabilization, minor channel realignment of low flow channel, and additional measures to protect the surrounding area.

engagement icon

Public Engagement

Public Information Centre (PIC)

Sept. 16, 2026 at 6 p.m.

Central Arena - auditorium

Public Engagement

Public Information Centre (PIC)

Sept. 16, 2026 at 6 p.m.

Central Arena - auditorium

The 2020 City Wide Creek Erosion Assessment Study identified ongoing erosion along Rambo Creek between Victoria Avenue and Emerald Crescent, posing a risk to public infrastructure, utilities, and nearby private properties.

Project scope

On the west side of the creek, erosion has caused the channel to widen, bringing the top of the bank to within less than 1 meter of private infrastructure, including a parking area with a wooden fence and concrete barrier wall. Several small stormwater outfalls in the area are in poor condition, and runoff from the adjacent parking lot is also contributing to further erosion.

As part of this project, the City will complete restoration in this section of Rambo Creek, as shown in the location map. The project will include creek bank stabilization, minor channel realignment of low flow channel, and additional measures to protect the surrounding area.

Public engagement

As public engagement is an important part of the city projects. The City will give residents, neighborhood businesses, community members and interested parties the chance to learn more about the project and comment at a Public Information Centre (PIC).

The project design is now complete and ready for resident feedback. A Public Information Centre (PIC) will be held to present the design, answer questions and gather feedback. Please see the Public Engagement information box for details.

Contacts

Please contact one of our team members if you have questions or comments, or would like to be added to the project mailing list.

Arif Shahzad, M.Eng, P.Eng.

Senior Stormwater Engineer - Capital

City of Burlington

426 Brant St., P.O. Box 5013, Burlington, ON L7R 3Z6

Engineering Services - Development and Stormwater Management

905-335-7600, ext. 7486

Email Arif Shahzad


Robert Amos, MASc., P.Eng.

Consultant Project Manager

Aquafor Beech Ltd.

2600 Skymark Ave. Building 6, Unit 2

Mississauga, ON L4W 5B2

905-629-0099, ext. 284

Email Robert Amos

Information for homeowners

The following information may be helpful If you are concerned about a construction project in your neighbourhood.

Documents, reports and updates

Updates will be posted throughout the project.

Subscribe Back to Stormwater Management Projects

Contact Us


City of Burlington
426 Brant St., PO Box 5013,
Burlington, ONĀ  L7R 3Z6

Phone: 905-335-7777
Toll Free: 1-877-213-3609
Email: city@burlington.ca