July 13, 2022 - 4:30 - 6 p.m. (Virtual)
MHBC Planning Ltd - 1450 King Road
Ward 1 Site Address
- 1450 King Road
- Application received
Proposed Development
- A zoning By-law Amendment to support the relocation of an existing stormwater management facility and its implementing zoning (Open Space (O2)), to lands located to the north of the existing installation. The existing facility will be decommissioned following the construction of the new stormwater management facility, and the former location will be rezoned to Business Corridor (BC2) to provide future development opportunities.
Planner on File
William Wallace
Community Planning
426 Brant St., Burlington, ON L7R 3Z6
905-335-7777, ext. 7824
william.wallace@burlington.ca
File Numbers
-
Zoning Bylaw Amendment: 520/04-23
Public Meetings
- Application Form - 2023-05-04
- Arborist Report Amendment - 2022-05-06
- Arborist Report revised 2024-05-29
- Burlington Hydro Encroachment revised 2024-04-22
- City Authorization Letter Rezoning - 2022-08-22
- Cost Estimate Landscape revised 2024-05-30
- Cover Letter - 2023-05-04
- Cover Letter - Revised
- Cover Letter revised 2024-06-14
- Decommissioned Conditions Area Drainage Plan - Revised
- Decommissioned Conditions Construction and Mobility Management Plan - Revised
- Decommissioned Conditions Removals Plan - Revised
- Decommissioned Conditions SWMF Grading Plan - Revised
- Decommissioned Conditions SWMF Servicing Plan - Revised
- Decommissioning Drain Plan - 2023-05-02
- Decommissioning Erosion Sediment Control - 2023-05-02
- Decommissioning Grading - 2023-05-02
- Decommissioning Removals - 2023-05-02
- Decommissioning Servicing - 2023-05-03
- Draft ZBA - Revised
- Draft Zoning Bylaw Amendment - 2023-05-02
- Drain Plan Interim - 2023-05-02
- EIA revised 2024-05-31
- Environmental Impact Assessment - 2023-05-04
- Environmental Impact Assessment_Revised
- Environmental Site Screening Questionnaire - 2022-12-06
- Erosion Sediment Control - 2023-05-02
- Existing Conditions Overall Drainage Plan - Revised
- Existing conditions Overall Drainage Plan - 2023-05-02
- Existing Conditions Site Drainage Plan - 2023-05-02
- Existing Conditions Site Drainage Plan - Revised
- Existing Utilities - Revised
- Geo Tech Report - 2022-01-24
- Hydrogeological Addendum - 2023-05-02
- Interim Conditions Removals Plan - Revised
- Interim Construction and Mobility Management Plan - Revised
- Interim SWMF Grading Plan - Revised
- Interim SWMF Servicing Plan - Revised
- Landscape Drawing Set revised 2024-05-30
- Landscape Plans - Revised
- Landscape Plans L 1 to L 3 - 2023-05-02
- Phase I ESA - Revised
- Phase One ESA - 2023-05-01
- Phase One ESA revised 2023-05-01
- Phase Two ESA revised 2024-06-13
- Pre Consultation Package Update - 2023-02-17
- Proposed Interim Conditions Site Drainage Plan - Revised
- Reference Plan 20R 22311 - 2022-11-21
- Reliance Letter - Geotechnical - Revised
- Reliance Letter Geo Rpt revised 2024-06-03
- Reliance Letter Phase 1 and Phase 2 ESA revised 2024-06-14
- Removals - 2023-05-02
- Servicing - 2023-05-03
- Set Back - 2023-05-02
- Site Layout Plan - Revised
- Site Plan Dimensions - 2023-05-02
- SPA Dwg 1 SetBack revised 2024-05-28
- SPA Dwg 10 DecommDrainPlan-Model revised 2024-05-28
- SPA Dwg 11 DecommESC revised 2024-05-28
- SPA Dwg 12 DecommRemovals revised 2024-05-28
- SPA Dwg 13 Decomm Grading-Model revised 2024-05-28
- SPA Dwg 14 - Decomm Servicing-Model revised 2024-05-28
- SPA Dwg 2 Utilities revised 2024-05-28
- SPA Dwg 3 ExODA-Model revised 2024-05-28
- SPA Dwg 4 ExSiteDP-Model revised 2024-05-28
- SPA Dwg 5 DrainPlanInterim-Model revised 2024-05-28
- SPA Dwg 6 ESC revised 2024-05-28
- SPA Dwg 7 Removals revised 2024-05-28
- SPA Dwg 8 SWMF Grading-Model revised 2024-05-28
- SPA Dwg 9 Servicing-Model revised 2024-05-28
- SPA Dwg SP1-Site Plan revised 2024-05-28
- Stormwater Management Facility Grading - 2023-05-02
- Stormwater Management Facility Vibration Impact Study - 2023-03-10
- Stormwater Management Report - 2023-05-02
- Supplementary Setback Analysis - Revised
- Survey Blocks 1 and 2 - 2017-12-21
- SWM Report - Revised
- Top of Bank Setback Limit - Revised
- Topsoil Fertility Report - 2023-04-27
- Tree Inventory and Preservation Plan revised 2024-05-29
- Tree Inventory and Preservation Plans - 2022-06-05
- Utilities - 2023-05-02
- ZBA Comment Reponse Matrix revised 2024-06-14
- ZBA Comment Response Matrix - Revised