The City of Burlington has initiated an environmental assessment (EA) for flood mitigation along Lower Rambo Creek partnering with Aquafor Beech Limited. This study aims to address flood risks, enhance climate resilience and support sustainable urban development in downtown Burlington. This assessment is part of the City's ongoing commitment to improve infrastructure and protect both the environment and the community from potential flood hazards.
Check this webpage for ongoing project updates. If you wish to receive email notifications whenever the project page is updated, use the button located at the bottom right corner of this page, beneath the Contact Us details. To stay informed about all current city construction projects and other municipal news, please subscribe using the button positioned at the top right corner of this page.
The EA will explore and evaluate various infrastructure solutions designed to mitigate flood hazards within the study area. The process will involve analyzing flood risks under different scenarios and selecting a preferred alternative that offers long term, effective storm water management. The evaluation will consider the environmental, social and economic impacts of each option, ensuring a balance between resilience and sustainability. Potential improvements include enhanced storm water conveyance systems, upgrades to creek crossings and naturalization efforts to support ecological functions.
The City of Burlington values input from residents, indigenous communities, and other stakeholders throughout the study. Public engagement opportunities will be provided at key stages of the project, including open houses and review periods for the draft EA report. Feedback gathered during these sessions will be essential in shaping the preferred mitigation strategy. Comments and suggestions submitted during the study will be documented and considered when selecting the final approach. Notifications regarding public consultation events and document reviews will be made available through various communication channels. To submit your feedback, request updates, or obtain alternative formats for accessibility, please contact the project representatives listed below. Information will be collected and managed in accordance with the municipal Freedom of Information and Protection of Privacy Act (MFIPPA), ensuring personal data remains confidential while other input is shared publicly as part of the EA record.
Project contacts |
Robert Amos, M.A.Sc., P.Eng. Project Manager Aquafor Beech Limited 416-705-2367 Umar Malik, M.Eng., P.Eng. Stormwater Engineer - Development City of Burlington 905-335-7600, ext. 7426
|
Updates will be posted throughout the project.
Project updates |