The City of Burlington will be continuing improvements on New Street at Tuck Creek. This will include the replacement of the New Street Bridge at Tuck Creek, road resurfacing, and storm water culvert replacement.
Check this webpage for ongoing project updates. If you wish to receive email notifications whenever the project page is updated, use the button located at the bottom right corner of this page, beneath the Contact Us details. To stay informed about all current city construction projects and other municipal news, please subscribe using the button positioned at the top right corner of this page.
Location | Scope | Tentative Schedule |
---|---|---|
New Street at Tuck Creek |
|
June 2025 to November 2026 |
Note: The construction schedule outlined is tentative. Additional information will be provided once the contract has been awarded and schedule confirmed.
During bridge construction, traffic will be staged allow the work to occur while maintaining vehicle flow in both directions. Lane reductions are anticipated on New Street within the project area. A single lane in each direction will be maintained for vehicle travel.
Residents and commuting traffic are urged to plan alternative routes or to allow for longer than regular travel times throughout the duration of the project.
Pedestrian detour routes will be maintained throughout the entirety of the project. The detour routes will have clear signage installed and will provide an alternative path around the construction work area.
Day-to-day construction |
Tom Georgiadis, Construction Inspector City of Burlington 905-220-1693 |
All other construction inquiries |
Chris Onishi , Project Manager City of Burlington 905-335-7600, ext. 7682 Nathan Youngs, Contract Administrator City of Burlington 289-208-2468 |
The following information may be helpful If you are concerned about a construction project in your neighbourhood.
Updates will be posted throughout the project.
Project updates |
|